A counterbalance spring is a consumable: stable force and cycle life matter
We keep the force consistent batch to batch and strengthen the surface for cycle life
Straight, bent or closed ends — formed to drawing, with torque and deflection angle calculated. We work with gate hardware, door closer, valve and brake mechanism manufacturers.
An engineer replies within one business day (Moscow + 5 hours). Prototypes — 48 hours after drawing approval.
Problems we solve
A counterbalance spring is a consumable: stable force and cycle life matter
We keep the force consistent batch to batch and strengthen the surface for cycle life
The ends must drop into the mechanism slots on the first try
Ends formed to drawing: straight, angled, closed
You need a torque calculation, not a trial-and-error match
We calculate torque and deflection angle for your assembly conditions
Technical parameters
| Wire diameter range | 0.1–30 mm |
|---|---|
| Materials | 65Mn, 72A, 82B, 60Si2Mn, 55CrSi, 51CrV4, 60Si2CrMn, 50CrV, SUP7, SWP-A/SWP-B, stainless steel 304/316 |
| Coatings | Zinc plating, nickel plating, chrome plating, cataphoresis, Dacromet, black oxide, passivation of stainless steel, preservative oil |
| Documents | IATF 16949:2016 certificate, test reports, product data sheet |
Process
Wire is sourced directly from Baowu (Baosteel), Kobe Steel, Bekaert and Qingdao Special Steel — that is what gives consistent characteristics from batch to batch.
Applications
Advantages
Proof, not promises
PDF, DWG, DXF, a sketch or a physical sample. We sign an NDA on request.
Our engineer checks manufacturability and proposes material and coating — we reply within one business day.
After alignment we produce prototypes and ship them to you. Then — a series batch with inspection and documentation.
FAQ
Yes. We accept drawings in PDF, DWG and DXF, sketches and physical samples. Standard prototyping lead time is 48 hours after the drawing and material are approved.
The selection depends on the operating conditions: temperature, load and environment. Our engineer will propose a steel grade (65Mn, 60Si2Mn, 55CrSi, 51CrV4, 50CrV, SUP7, SWP-A/SWP-B, stainless steel 304/316, etc.) and a coating — from zinc and chrome plating to Dacromet and passivation of stainless steel.
Minimum order — 1 pc (MOQ 1): we will make a batch even from a single part. The price depends on wire diameter, material, coating and volume — send a drawing and we will reply with the price and lead time.
We arrange rail container transport, road freight and sea shipping via Far East ports. Delivery terms (FOB, CIF, DAP) are agreed per order.
Yes, we work under NDA: customer drawings and technical documentation are never shared with third parties or used for other customers.