Skip to content
XULONG SPRING — spring manufacturing plant logo XULONG SPRING

Custom Extension Springs — Hooks in Any Configuration

German and English hooks, coiled loops, threaded ends. We manufacture to drawing or sample — with force calculation and initial tension matched to your application.

Wire diameter
0.1–80 mm
Hook shape
to drawing
Quality system
IATF 16949:2016

An engineer replies within one business day (Moscow + 5 hours). Prototypes — 48 hours after drawing approval.

Extension springs with hooks — manufactured to customer drawings
1 979
founded
47 years in spring manufacturing
145
employees
many with 15+ years in the industry
900 t
springs per month
maximum capacity
60+
coiling machines
cold and hot coiling, CNC

Problems we solve

Your problem — our solution

The hook must fit the finished assembly without rework

Hooks formed strictly to drawing: German, English, coiled loops, threaded ends

The force is off — the mechanism does not work as designed

We select geometry and initial tension for the required force

Seasonal demand cannot wait for long lead times

Prototypes in 48 hours, then a fixed schedule for series deliveries

Technical parameters

Made for your conditions

Wire diameter range 0.1–80 mm
Materials 65Mn, 72A, 82B, 60Si2Mn, 55CrSi, 51CrV4, 60Si2CrMn
Coatings Zinc plating, nickel plating, cataphoresis, Dacromet, black oxide, preservative oil
Documents IATF 16949:2016 certificate, test reports, product data sheet
Extension spring with a coiled loop — close-up

Process

How we make it

  1. 01 Cold coiling
  2. 02 loop forming
  3. 03 heat treatment
  4. 04 coating

Wire is sourced directly from Baowu (Baosteel), Kobe Steel, Bekaert and Qingdao Special Steel — that is what gives consistent characteristics from batch to batch.

Advantages

Why factories choose XULONG SPRING

Hooks made for your assembly, not from a catalogue We form hooks in any configuration to drawing — from classic German and English loops to coiled eyes, hooks and threaded ends. Length and initial tension follow your specification.
In-house testing laboratory 60+ coiling machines, 6 load-testing machines rated up to 50 tons, a salt spray chamber, a 2.5D projector — inspection never leaves the factory.
Batch inspection and documentation Test reports and a product data sheet for every batch. IATF 16949:2016 certificate — a full document package for EAC declaration.
Logistics and terms for Russia Rail containers, road freight, sea freight via Far East ports (FOB, CIF, DAP). Payment in CNY, ready to work under NDA.

Proof, not promises

Quality control of every batch

Extension spring test curve on the screen of a testing machine
More about our quality system and IATF 16949:2016 certificate

What removes the risks of sourcing from China

  • NDA on request Drawings and technical documentation are never shared with third parties or used for other customers.
  • Prototypes in 48 hours You test the samples first — series production is agreed only after your approval.
  • Reports for every batch Load, geometry, hardness — with measurement protocols and batch traceability.
  • Document package for EAC IATF 16949:2016 certificate, test reports and product data sheets — for declaration and customs.
  • Payment in CNY Payment terms and channel are agreed individually before the order is signed.
  • Delivery to Russia Rail, road and sea freight via the Far East. Incoterms: FOB, CIF, DAP.

How to start — three steps

  1. 01

    Send a drawing or a sample

    PDF, DWG, DXF, a sketch or a physical sample. We sign an NDA on request.

  2. 02

    Get a price and lead time

    Our engineer checks manufacturability and proposes material and coating — we reply within one business day.

  3. 03

    Test prototypes in 48 hours

    After alignment we produce prototypes and ship them to you. Then — a series batch with inspection and documentation.

FAQ

Questions about extension springs

Can we order these extension springs made to our drawing?

Yes. We accept drawings in PDF, DWG and DXF, sketches and physical samples. Standard prototyping lead time is 48 hours after the drawing and material are approved.

Which material and coating do you recommend?

The selection depends on the operating conditions: temperature, load and environment. Our engineer will propose a steel grade (65Mn, 60Si2Mn, 55CrSi, 51CrV4, etc.) and a coating — from zinc plating to Dacromet.

How are the price and minimum order calculated?

The price depends on wire diameter, material, coating and batch volume. Send a drawing with the required quantity — we will reply with a price, lead time and minimum volume.

How do you deliver products to Russia?

We arrange rail container transport, road freight and sea shipping via Far East ports. Delivery terms (FOB, CIF, DAP) are agreed per order.

Can we sign a confidentiality agreement?

Yes, we work under NDA: customer drawings and technical documentation are never shared with third parties or used for other customers.

Chat on Telegram Chat on WhatsApp