EAC Certification for Springs in 2026: What Changed for Buyers

When do springs need EAC documents under TR CU 010/2011: certificate vs declaration, the EAEU applicant, the FGIS registry and the factory document package.

A XULONG SPRING laboratory specialist runs a hardness test on a hardness tester and records the result for the test report

“Do springs need EAC documents?” — that is the first question a procurement engineer asks after the price is agreed, and it is the right order of actions: the conformity-assessment scheme affects both the delivery schedule and customs clearance. The complication is that the rules changed in 2026, while some suppliers still work from outdated instructions — some claim “everything got stricter in September”, others promise a certificate in a week without clarifying who will act as the applicant.

We are XULONG SPRING, a spring factory in Foshan, Guangdong, China. We have been manufacturing springs since 1979: wire from 0.1 to 80 mm, hot coiling up to 80 mm with developed lengths up to 18 m, load testing from 50 N to 60 t, and a production capacity of 900 tonnes per month. Let us state our role upfront: we are not a resident of the Eurasian Economic Union and we do not issue EAC certificates or declarations in our own name — that is done by an applicant registered in the EAEU. But a substantial part of the outcome depends on the factory: the document package, the test reports and correct marking. Below is how the procedure looks in 2026 and what to settle before signing a contract.

1. When springs need EAC at all: intended use and the TN VED code

The baseline document is TR CU 010/2011 “On safety of machinery and equipment”. It covers machinery and equipment placed on the EAEU market — not “goods in general”. So the answer to “is a document required for springs” depends not on the product name but on three things:

  1. The intended use of the assembly. Which machine the spring works in, what loads it takes, and whether it affects the safety of the equipment.
  2. The TN VED (HS-based) code. For helical springs of ferrous metal this is heading 7320 of the EAEU TN VED. Customs matches the goods against the regulation lists by code.
  3. The form of supply. A spare part supplied separately, a component for the buyer’s own equipment production, or a part of a machine imported as a complete unit — three different scenarios.

In practice three cases occur:

  • A spring as a spare part for repair. According to the position of a number of certification bodies, spare parts supplied separately for the repair of machinery already in service fall outside the scope of TR CU 010/2011 — the document is required for the machine, not for the part. The final call, however, rests with the customs authority and the applicant: confirm the option for your specific code and intended use rather than relying on a generic answer from the internet.
  • A spring as a component for the buyer’s equipment production. The regulation’s requirements fall on the production of the final machine. In this case the factory needs to provide test reports, material data and marking so the buyer can include the component in their own conformity file.
  • A spring as part of a machine imported into the EAEU. The spring enters the certification scope of the machine itself as one of its parts.

Practical conclusion: settle the TN VED code and intended-use question before signing the contract — with the buyer’s customs broker or with a certification body. We do not replace the broker, but we do provide every technical document the chosen scheme requires.

2. What changed in 2026: two stages, not one

The amendments to TR CU 010/2011 were adopted by EEC Decision No. 36 (published on 8 April 2026) and enter into force in stages. Do not confuse the dates — this is where both suppliers and buyers most often slip up.

DateWhat happensWhat it means for the buyer
01.01.2026In Russia (Government Resolution No. 1669) electronic registration of certificates and declarations in the FGIS registry becomes mandatoryA paper form on its own carries no weight — customs checks the registry entry
01.09.2026The updated version of TR CU 010/2011 enters into forceThe new requirements for machinery and the document package are already in effect
01.04.2028The expanded lists start to apply: the scope of mandatory certification (CoC) grows from 15 to 31 product types, the declaration list grows to 64If your assembly falls into the expanded list, plan the conformity scheme in advance
01.09.2031The latest expiry date for documents issued before 01.09.2026Certificates and declarations issued earlier remain valid until their expiry, but no later than this date

Note that the expanded lists (15 → 31 types) apply only from 1 April 2028. Writing that they are “already in force” is a mistake any professional buyer will spot. But postponing the decision to 2028 is not an option either: sample testing, preparation of technical documentation and coordination with a certification body take months, not weeks. If your type of equipment falls into the expanding list, build the scheme into your delivery schedule now.

3. Certificate of conformity (CoC) or declaration (DoC): how the scheme is determined

The conformity-assessment scheme is set not by the parties’ preference or by “supplier habit” but by the lists in TR CU 010/2011 itself — subject to the transition deadlines above. The difference between the two schemes is as follows.

CriterionCertificate of conformity (CoC)Declaration of conformity (DoC)
Issued byan accredited certification bodythe applicant — an EAEU resident
Based ontest reports from an accredited laboratory + production audittest reports from an accredited laboratory
Sample testingmandatorymandatory
Post-issue controlsurveillance audits during the validity periodnot provided
Typical scopeequipment on the mandatory certification listequipment on the declaration list

For either scheme the factory’s contribution is a standard package: drawings, material data with heat traceability, test reports, and a description of operating conditions. If the batch goes through a scheme with sample testing, it makes sense for the buyer to receive and test prototypes first and only then start the procedure: with us, prototypes are produced within 48 hours after the drawing and material are approved, and the same samples can go to an accredited laboratory for the test reports.

We will also stress something we consider a matter of professional ethics: no supplier can “guarantee a certificate” — the decision is made by the certification body based on test results. Anyone promising an outcome before testing either does not understand the procedure or is not telling the whole truth.

4. Who can be the applicant: why a Russian representative is needed

The applicant (holder of the certificate or declaration) can only be a legal entity or individual entrepreneur registered in the EAEU. A Chinese factory cannot act in this role — and that is not a formality but a fundamental principle of the procedure: the applicant answers to the supervisory authorities for the document.

OptionWhen it is convenientWhat to look at
The buyer-importera one-off or regular supply under the buyer’s own contractsthe applicant holds the document and answers to customs; the factory only needs to issue the document package
A Russian legal representative of the factory under contractthe factory has many EAEU customers and the buyer does not want to hold the documentthe contract should fix rights to the document, renewal procedure and allocation of responsibility
Declaration based on the buyer’s documentsa DoC scheme with the batch imported by the buyerthe factory needs to issue the full technical package and agree the product naming

In our own name we hold only the IATF 16949:2016 quality-management-system certificate (certification body: Intertek, No. 0495241, valid until 08.01.2027; this standard includes the requirements of ISO 9001:2015). We do not issue EAC certificates or declarations — we are not an EAEU resident. Our role is the complete technical document package, answers to the certification body’s technical questions, and coordination until the procedure is complete. You can read more about our laboratory and quality control on the Quality page.

5. Electronic certificates and the FGIS registry: what customs checks

Since 2026, information about certificates and declarations is entered into the state registry (FGIS), and it is the registry entry — not the paper form — that proves the document is valid. When clearing a batch, customs verifies:

  • the document status — whether it is valid on the release date and does not expire before the goods arrive;
  • the match of product name and code — as written in the certificate/declaration and in the customs declaration; a code mismatch is one of the most common causes of delays;
  • the applicant’s details — whether they match the consignee or the contract;
  • marking — the EAC mark on the product and packaging where it is required.

A practical tip that saves weeks: check the document number in the public registry before shipment and keep the extract in the delivery file. Second: agree the product naming for the certificate or declaration in advance — the factory will state the name, specifications and code exactly as the applicant needs. Redoing a document after the batch has shipped costs far more than ten minutes of coordination before signing the contract.

6. What the factory provides and what the buyer needs

To get through the procedure without rejections, it is best to divide the roles in advance. Below is the working split we use.

From XULONG SPRINGFrom the buyer (applicant)
IATF 16949:2016 certificate (Intertek No. 0495241)Determine the TN VED code and the equipment category
Material certificates for the spring steel, traceable to the heatChoose the scheme (CoC or DoC) and the applicant
Test reports: force–deflection, hardness, metallography, salt spray (on request)Contract a certification body and a laboratory
Product data sheet for the batchAgree the product naming and code wording for the document
Marking and shipping documents (with Russian-language data on request)Verify the document in the FGIS registry before shipment
Prototypes within 48 hours after drawing and material approvalSpecify marking requirements in the order specification
Answers to the certification body’s technical questionsPlace the product into circulation in line with the document

If your task is large hot-coiled springs — for crushing and screening equipment, for example — see the Large springs section: for large cross-sections and long developed lengths, test-report requirements are usually stricter, and we prepare them for every batch. And for how springs for vibrating screens are selected, see our separate article.

A short checklist before ordering

  1. Determine the TN VED code and the intended use of the assembly — get a written opinion from your broker or a certification body.
  2. Check whether your type of equipment falls into the expanded mandatory-certification list that applies from 01.04.2028.
  3. Define the applicant: your importer or a Russian representative of the factory.
  4. Agree with the factory the naming, specifications and document package for the chosen scheme.
  5. Receive and test prototypes before a series batch — with us that takes 48 hours after drawing approval.
  6. Verify the certificate or declaration in the FGIS registry before shipment.

Practice shows: customs problems are almost never about the springs themselves — they are about documents prepared in a hurry. A package from the factory prepared before the contract is cheaper than any rejection.

Need the documents broken down for your TN VED code? Send a drawing and describe the duty of the assembly — a factory engineer will prepare the document package for your scheme and agree the schedule. Fast contact: the Telegram bot @xulong_ru_inquiry_bot, or send your request via the form on the Contacts page.

Need a calculation for a specific part? Send a drawing or describe the duty conditions of the assembly — a factory engineer will prepare an offer. Contact: info@xulong-pruzhiny.com.

Request a quote

Send your drawing — we will reply with a price and lead time

Specify the spring type, wire diameter, material and quantity. Our engineer will review the task and suggest design optimizations for manufacturing if needed. Prototypes are produced within 48 hours after drawing approval.

Chat on Telegram Chat on WhatsApp